#ROADWORKS - WEEK COMMENCING 19TH AUGUST Please note that dates - TopicsExpress



          

#ROADWORKS - WEEK COMMENCING 19TH AUGUST Please note that dates are correct at time of going to press. Works may be affected by inclement weather and updates will be issued where possible. STOCKTON TOWN CENTRE WORKS St Johns Crossing – Riverside / Bridge Road, Stockton Birse Civils LTD are continuing works on a scheme to improve access to Stockton town centre. The works will include two new linked signal-controlled junctions in place of the existing Riverside Road / Bridge Road roundabout, and realignment of Riverside Road to straighten out its connection with 1825 Way. The construction works are expected to be completed in autumn 2013. The majority of the work will take place during the daytime with most traffic management measures in place between 9:30am and 3:30pm. To allow carriageway construction and resurfacing works to be carried out, various overnight road closures / lane restrictions will be in operation during weeknights for the next 2-3 weeks. Monday 19 August – Friday 23 August – Temporary lane restrictions and road closures will be in operation at various locations on Churchyard Link Road and Bridge Road / A1305 Bridge Road. Pedestrian access will be maintained at all times. Dovecot Street area As part of the Stockton Town Centre regeneration scheme, works will start on Dovecot Street between Café Nero and the Storytellers pub near ARC on Tuesday 6 August 2013 for approximately 34 weeks. The following traffic management arrangements will be in place for seven weeks: Dovecot Street – Temporary one way only from Brunswick Street to Prince Regent Street (with access to Prince Regent Street / Nelson Terrace only). The eastern length between Prince Regent Street / Nelson Terrace and the High Street will be closed (except for access for business deliveries/loading) and a "left turn only" will be in operation out of West Row Car Park. Prince Regent Street – Temporary lane restrictions will be in operation in each direction. Signed diversions will be in operation. Pedestrian access will be maintained at all times. OTHER WORKS Darlington Road, Stockton As a result of SBC Direct Services carrying out a tarmac footpath maintenance scheme, temporary Stop / Go boards or Give and Take will continue to be in operation, where required, on Darlington Road for approximately 1 further week. A177 Durham Road, Stockton As the result of Northern Gas Networks carrying out urgent gas main repairs, temporary traffic Signals (Coneworx 01642 625999 ) are required on A177 Durham Road between Hardwick roundabout and The Horse & Jockey roundabout from Monday 5 August until Friday 30 August 2013, 24hr operation manually controlled at peak times. Teesside Park Drive, Thornaby As a result of SBC Direct Services carrying out drain repair works, a temporary south bound splitter lane closure will be in operation south of the A66 overbridge from Monday 5 August until Wednesday 21 August 2013. Thornaby Road / Millbank Lane / Uppergreen Lane, Thornaby As a result of Northern Powergrid/Balfour Beatty Solutions carrying out replacement of HV electric cables, temporary traffic signals (Coneworx 01642 625999 / 07703671769) are required at the Thornaby Road / Millbank Lane / Uppergreen Lane, junction from 12 August until 23 August 2013. Signals to be manned at peak times. Melrose Avenue Billingham As a result of SBC/Lafarge Tarmac carrying out a number of carriageway resurfacing works, temporary 2-way traffic signals (Hattons Traffic Management 01388-710880) are required on Melrose Avenue from The Causeway to Lumley Road from Thursday 15 August until Wednesday 21 August 2013, off peak working only Braemar Road Billingham As a result of SBC/Lafarge Tarmac carrying out carriageway resurfacing works, a temporary road closure to through traffic (Hattons Traffic Management 01388 710880) is required on Breamar Road, from Marsh House Avenue to Farleigh Close, from Thursday 15 August until Tuesday 20 August 2013, off peak working only. Bishopton Lane, Stockton As a result of Northern Gas Networks carrying out essential gas works, a bus lane closure is still required from High Street to Allison Street until Wednesday 21 August 2013. Yarm Road, Eaglescliffe As a result of NWL/Seymour’s carrying out repair works to a manhole, temporary traffic signals (Seymour’s 01429231313) are required o/s 632 Yarm Road on Saturday 17 August 2013 for one day only. Allensway, Thornaby As a result of NWL/Seymour’s installing a new sewer connection, traffic signals (Seymour’s 01429231313) are required o/s St Peters House on Allensway from Monday 19 August until Wednesday 28 August 2013 and will be manually controlled at peak times. Oxbridge Lane, Stockton As a result of NWL/Seymour’s carrying out sewer repairs, traffic signals (Seymour’s 01429231313) are required on Oxbridge Lane/Malvern Road from Monday 19 August until Friday 30 August 2013 and will be manually controlled at peak times High Lane, Maltby Village As a result of British Telecom carrying out cabling works, temporary traffic signals (A Plant 03700500792) are required on High Lane/Roger Lane on Tuesday 20 August 2013, for one day only. Roger Lane, Maltby Village As a result of British Telecom carrying out cabling works, temporary traffic signals (A Plant 03700500792) are required along Roger Lane on Wednesday 21 August 2013, for one day only. A135 Yarm Road As a result of Middlesbrough Traffic Signals / Diamond Northern installing new carriageway sensor loops, temporary traffic signals (01642728171) are required on Yarm Road, near to the junction with Preston Lane, from Thursday 22 August until Friday 23 August 2013, off peak. Upsall Grove, Stockton As a result of SBC Direct Services carrying out verge block paving works, temporary Stop / Go boards or Give and Take will be in operation, where required, on Upsall Grove from Monday 19 August for approximately 10 working days. Darlington Lane, Stockton As a result of SBC Direct Services carrying out works to install a pedestrian refuge, temporary traffic signals will be in operation on Darlington Lane, east of Gentian Way roundabout, from Monday 19 August for approximately 15 working days, off peak only. New Road, Billingham As a result of GrowHow UK installing cable rollers across pipe bridge from Growhow site to Lucite site, temporary Stop / Go boards will be in operation, where required, on New Road on Saturday 24 August and Saturday 31 August 2013.
Posted on: Fri, 16 Aug 2013 20:22:05 +0000

Trending Topics



Recently Viewed Topics




© 2015