Abbottabad: Road extension plan in City bring Lot of hopes for the public during start of Operation against encroachments people suffer with huge loss. But with the passage of time District government comes up with lot of changes in Operation Plan and minimize the extension plan from 65 to 35 at Gami ada which raised lot of fingers at credibility of whole operation. On the other hand WAPDA and NHA don,t have any PC 1 available on record regarding construction of road and removing Electric Polls. This vague situation making people confuse. In this report Team HCP tried to cover different angels of the Operation. For your feedback please join us at facebook/hazara.pk
Posted on: Tue, 11 Feb 2014 11:31:35 +0000