Briefly Explanation about New Technology with low Cost Products - TopicsExpress



          

Briefly Explanation about New Technology with low Cost Products for Solar Power Plants and Solar Power Energy Groups Solar Power Energy Groups invitation to Establishment Executive Consultant Corporation Groups to Design , supply equipments and Instillation - low cost product Solar Power Plant with different Capacity Start with - 125 mw , 250 mw , 500 mw to 1000 mw To record your company and apply prices offer on bid - Contact with groups as Technical Cooperation , Representation of Solar power energy groups Engineer / Reda Mohamed Ahmed Ahmed Wahb Mobil : 002 0122 3178476 Egypt Email ; reda_wahb@yahoo Primary I invitation all USA , Russian , china , European Union countries and Egyptian Contractors Group to Establishment Executive Consultant groups Specialized in design , supplying and installation Solar Power plants contain main contractors and subcontractor in following fields . An invitation for the establishment of an executive group for the implementation of the power plants of solar energy with new technology The objective of the establishment of the group is to create a group of companies working to establish power plants of solar energy capacity of 1,000 MW and a cost of production is equal to the cost of generating electricity from oil = 0.06 $ / kw in North Africa in Egypt , Algeria, Morocco, at latitude 30 degrees north line equator to export energy to Europe that advancing their production to the governments of Egypt , Algeria, Morocco and the European Union countries and groups of Arab and Europeans investors , European Investment Bank , European development Bank and World Bank to finance these projects on the basis that the goal of these projects is to develop and refresh economy of countries Egypt , Algeria, Morocco, and that will be establishment of projects in the desert to provide employment opportunities for young people and to achieve a enter earn of the country from taxes and the right to use land that will be instillation project . - This project favored for establishment of such projects in Egypt to the availability of professional technical labor and this relative reduce in prices and labor costs , which reduce the cost of production of kwh to drop to $ 0.05 . - Also the European countries will be importing clean energy and saving the expenses of oil imports - to maximize the uses of solar energy and reduce energy prices after producing 25% of energy from solar energy in ten years, beginning 2015: 2025 - So it will only call on European companies and American and Japanese and Egyptian companies operating in the construction of power plants . I will be invited Egyptian companies Kahromika , Orascom for Construction and Development Company and the Egyptian Petrojet com. and ABB company . Also I will be invited European companies Siemens , Alstom , and Ansaldo – and Aspin companies to sharing --- etc. Also I invite USA Government to Establishment these Projects in South of USA at latitude 30 degrees north - witch passing through South state as Texas , Louisiana , Mississippi , Alabama and Florida states to produced amount of energy enough to middle and north states The groups will be start work by provide a works of design , supply , installation for two power plant were announced from the European development Bank is funded by Saudi Arabia, Kuwait and the European Bank tender bid for design , supply and erect two power plant with a capacity of 500 MW in Damietta in Egypt and other in the youth projects in Ismailia capacity of 1,000 MW . The open of tender envelopes are opened in Cairo on date 26 Sept 2014 Briefly Explanation about New Technology with low Cost Products for Solar Power Plants and Solar Power Energy Groups The Solar Power Plants divided into 10 main parts as following . Supply and Erect Steel Structure work as following . Detail steel structure works needed for Solar power plant with capacity 500 mw include 40,000 panels manufacture from square tube section 50x50x 6 mm + 240,000 Panels hanged unit + 40,000 column manufacture from square tube section 70 x 70 x 6 mm for panels support + 40,000 steel beam manufacture from milled steel square tube section 70 x 70 x 6 mm for hangings panels + 2400 steel beam to connection between panel raw + 5,000 milled steel column for support steam pipe to transition steam between different unites in plant manufacture from square tube section 70 x 70 x 6 mm The contractor for supply, fabrication and erection steel structure should be 1- Enable to manufacture and erect 100 part from every type every day include 100 column +100 Panels hanged unit + 100 steel beam + 100 steel frame panels ….+ etc tube section 70 x 70 x 6 mm for hangings panels + 2400 steel beam to connection between panel raw + 5,000 milled steel column for support steam pipe to transition steam between different unites in plant manufacture from square tube section 70 x 70 x 6 mm The contractor for supply, fabrication and erection steel structure should be 1- Enable to manufacture and erect 100 part from every type every day include 100 column +100 Panels hanged unit + 100 steel beam + 100 steel frame panels ….+ etc 2- all fabricated work will be establishment by automatic CNC machining in the site at Egypt or the contractor should be enable to install workshop full automatic machine for electric welding machine and cut machine for steel square pipe and collection and fabrication all parts to product 100 part from every type every day. 3- All steel pipes sections should be welded or seamless square tube or black welded steel pipe as drawing and with thickness = 6 mm and standard code ASTM /ANSI . 4- all steel work should be painting with aluminum color 4 phase – 2 primary after manufacture and two phase after erection as basic of manufacture and standard code ASTM /ANSI 5- The contractor for supply, fabrication and erection steel structure After erection and painting shall be erect 1,680,000 PV modules by using fixed plate with dimension 200x 60 x 6 mm – Monocrystalline Silicon every one with power 285 wp 2 - Design , Supply and Erect Collector Solar radiation pipes and Transmitting Pipe lines 1 - Supply and erect in Egypt steam pipe line for Direct thermal Solar Power Plant with Capacity 500 mw contain 400 panels raw Every one contain 100 parabolic trough Panels with length = 1189.3 m and total collector steam pipe length = 1189.3 m x 400 raw = 475,720 m with diameter 40 cm – and type ASTM TP304 High Pressure Seamless Stainless Steel Pipe schedule 150 bar painting with ceramic paint to absorbed thermal radiation . And all accessories valves , control valves , expansion joint , pipe supports , works . supply and erect all accessories for every raw contain 2 expansion joint + 2 check valve + 2 gate valve + 2 control valve with total quantity = 800 units for every item for solar power plant with capacity 500mw . 2- Transmitting Pipe lines- Supply and erect in Egypt Transmitting Pipe lines with Estimation total length about 30,000 m with diameter 60 cm steam pipe ASTM /ANSI DIN 17456-85 DIN 17458-85 DIN 17459-92. ect - schedule 150 bar . 2-Supply and erect woolen glass isolation with thickness 10 cm 3- Supply and erect all accessories control valves with diameter 60 cm . 3 –Complete PV Solar power plant include the following ;- The Double effect solar power plant ( PV + CSP ) System contain two system as PV Modules + CSP System in same panels. 1-The solar power plant with capacity 500 mw contain two plant every one with capacity 250 mw divided to 2 unit – one to generate energy at sunlight in the morning and anther for storage energy to use in night . 2- we use PV system in the plant as alternative to use assistance by natural gas to continues operation the plant . 3- the solar panel are steel frame with shape parabolic trough divided into 42 section every one contain one PV modules using for generate power energy and reflector for sun radiation to operate CSP system . 4 - solar power energy with capacity 500 mw contain 40,000 panels every panels contain 42 PV Modules with total quantity = 1,680,000 PV modules Design ,supply and Erect Complete PV Solar power plant include the following ;- 1- supply and transitions to site of plant in Egypt without erection 1,680,000 PV modules – Monocrystalline Silicon every one with power 285 wp including all accessories . • Solar charge controller – regulates the voltage and current coming from the PV panels going to battery and prevents battery overcharging and prolongs the battery life. • Inverter – converts DC output of PV panels or wind turbine into a clean AC current for AC appliances or fed back into grid line. 2- Supply and erect 40,000 lithium- ion Battery every one with charge capacity 100 kwh– with rate six batteries for every panel . 3 – Design , supply and erect 40,000 collection control cabins and connection to 400 branches control unite Every one control in 100 panels - for stores energy for supplying to electrical appliances when there is a demand. panels as like following example . 4 -design , supply and erect 400 branches Central monitoring and control for PV plant For 400 control building to automatic supervisor control for PV charge batteries cabinet for plant system every one control in 100 panels batteries cabin like to contain the following example and suitable for present system . 4 – Thermal Concrete storage area as following . Design , supply and erect all component including civil work and isolation work + supply , manufacture and erection for 2 x 540 modules with total number of modules needed for plant with capacity 250 mw = 2x540 = 1080 modules 1- Concrete thermal storage energy for plant with capacity 250 mw Contain 324 modules divided in 3 unites every unite divided to 3 area for preheated steam area and saturated steam area and superheat steam area every area contain 2 block concrete thermal storage energy every block contain six modules . 2- Heat exchanger concrete for re-heat steam turbine exhaust . Heat exchanger concrete for plant with capacity 250 mw Contain 3 unite every one contain 72 modules divided to 3 area for preheated steam area and saturated steam area and superheat steam area every area contain 2 block concrete and total number of modules = 216 modules to reheat steam turbine exhaust during day and assistant to reheat steam turbine exhaust during the night for operation 14 hours during the night with total number of modules needed for plant with capacity 250 mw = 324 +216 =540 modules . 3 – Thermal Storage Concrete Modules with dimension 18 m length x 4 m high and 2.6 m width and contain 468 high pressure steam pipes every on with diameter 5 cm distribution in 39 horizontal raw every raw contain 12 pipes type ASTM TP304 High Pressure Seamless Stainless Steel Pipe schedule 150 bar and all pipe supported on square steel tube contain 7 support steel frame distribution every 3m in length direction the main outline of frame manufacture from milled steel square tube 50x 50 x 6 mm and the inlet pipe support under every raw manufacture from milled steel square tube 40x40x 4mm . 5 – Design , supply and erect steam turbine and building 1 - Supply and Erect Steam Turbine Building as drawing . 2 - supply and erect Overhead Crane six move 20 ton for maintenance turbine works . 3 - Supply and erected four Steam turbine (3+1) low pressure one stage and one case complete with all accessories and controlee system for parabolic trough solar field capable of generating of solar heat at a temperature of 400° C, 100 bar every one 77 MW(e) 4 - Supply and erected four Steam turbine (3+1) low pressure one stage and one case complete with all accessories and controlee system for parabolic trough solar field capable of generating about 60 mw to work at night The SST-300 is a single-casing turbine, geared for generator drive. It has a compact and flexible design with a high degree of standardization. Used for power generation applications. Technical data - Power output up to 60MW - Inlet pressure 100 bar - Inlet temperature 400°C - Rotational speed up to 12,000 rpm - Controlled extraction up to 45bar and up to 400°C - Bleed up to 60bar - Exhaust pressure (back pressure) up to 16bar 6 – Rotating Concentrating Solar Panel to received sun radiation system . 1- supply and erect 80,000 hydraulic telescopic cylinder modules no.1 . 2- supply and erect 80,000 hydraulic telescopic cylinder modules no.2 . 3- supply and erect 80,000 change rotating direction lever . 4- supply and erect 40,000 hydraulic cabin every one contain hydraulic pump + hydraulic oil tank + hydraulic solenoids valves + all necessary accessories . 5- design , supply and erect 400 branches control building to automatic supervisor control in operation rotating system for every 100 panels every one like to contain the following example and suitable for present system . 7 – Design , supply and erect Solar Power plant Automation System for Transmission , Transformation And Distribution Grid like the following system but suitable for solar power plant with capacity 250 mw working by double effect system (PV +CSP) We shall giving designer chance for choosing from the following technical specification in following examples to getting modern design suitable for our plant design shall be include following item . 1- Battery Storage Aided Grid Connection PV Power Plant 2-Structure of a Grid Connected Large PV Power Plant 3 - Solar single-phase string inverters between 2kW and 6kW focusing on residential and small commercial applications. 4 - System Impedance and Stability Recommendation for Multiple String Inverters in Large PV Power Plant . 5 - Main Transformer for CSP unites 6 - Substation 7 - Distribution Grid 8 - Automation System for Distribution Grid 9- Master station automation system of smart self-healing distribution grid: Applied Technologies: • Based on IEC CIM/CIS technical standard; • Smart quick fault processing technology of distribution grid based on MAS; • Network topological relation real-time online calculation of distribution grid; • Application of genetic algorithm and candidate restoring tree algorithm in fault recovery of distribution grid; • Considering distribution grid fault recovery of multi-optimal objective and multi-recovery path; • Network restructuring technology and self-optimizing technology of smart distribution grid; • “Self-healing” technology of smart distribution grid; • Recovery plan specialist library technology of distribution grid; • Distributed self-discipline quick calculation algorithm; • Distribution grid health diagnosis and early warning technology. 10 – Design , supply and erect all cable-net necessary for connection between all unite for Solar Power plant with capacity 250 mw and suggested methods to connection with second plant with same capacity 250 mw to produce total power = 500 mw. 8 - Design , Supply and erect pressure vessel tanks and Air Condensing Heat Exchanger as following drawing . 1- Eight drum in input of Superheat steam turbine . 2- Eight Feed water storage tank and Deaerator air separator drum And Storage boiling water tanks ( 6+2 ) as suction of feed water pump 3 – Eight Condensing water – steam separator drum in end of convert steam state from wet steam to saturation or from saturation steam to superheat steam 4 –Eight Air Condensing Heat Exchanger ( 4+2 ) for Condense Exhaust Steam Turbine. 9 - Design , Supply and Erect Circulations Hot water Pumps Station and Steel Building in Thermal Solar Power Energy with Capacity 250 mw 1 - Supply and erect 3 boiler feed water pump (2+1) for solar power energy plant with capacity 250 mw in Egypt with following specification . HGB / HGC® / HGD Boiler feed pump or equalizer specification DN 150 Q [m3/h] max. 2300 H [m] max. 5300 p [bar] max. 560 T [°C] max. + 210 n [min-1] max. 7000 Data for 50 Hz operation, higher values available upon request Design: Horizontal, radially split, multistage ring-section pump with radial impellers, single- or double-entry. Applications: Handling of feed water and condensate in power stations and industrial facilities, generation of pressurized water for bark peeling machines, descaling equipment, snow guns, etc. the prices offer include supply and erect all necessary all accessories needed for operating system , valves , flanges , automation and control panels and measurement gauge , protection system for valves closed and operation , electric motor start up and close , complete surge analysis … etc . 2 - Boiler Feed pump Steel Structure Building as drawing . 3 - Design , supply and erect 3 ( 2+1 ) Raw water feed pumps every one with Capacity 1000 m3/h at 10 bar . 4 - Design , Supply and erect water treatment plant with suitable capacity . 5 - Supply and erect Overhead Crane six move 20 ton for maintenance works . 10 – design , supply and erect civil works . All design for civil work shall be start after finishing design mechanical and electrical And based on that I will not against fee as a coordinator in the group and representation and connection for the group , starting from now emailed my Email ; reda_wahb@yahoo telephone ; 00201223178476 until the founding of the group unpaid versus that - I get paid a percentage of project costs when hiring from the customer s total cost for all project from every projects are as follows : - 1- 1 % of the total cost of the project against the intellectual property rights to the patent number 1084/2012 registered in the name Reda Mohamed Ahmed Ahmed recording at Egyptian Patent Office on 6/13/2012 2- 1 % of the total cost of the project against the intellectual property rights to the technical specifications of the project 3 - 1 % of the total value of the project against the coordination between the Advisory Group and its offices and the Egyptian government or any government is represented as a delegate and financiers connection as commissioner for the group , starting from now until the beginning of the project in 2015 . 4 - 1 % compared to supervise the preparation and implementation schedule for implementation and writing reports on the progress of work My receivables , a total of 4% of the total business will be added to the offer price as an expense management for the project. From the above it will be the setting of the founding of the group in two phases as follows 1 - after studying the technical specifications attached is sent preliminary approval to join the group in one of the disciplines described as a contractor specialist or an office consultant or contractor public projects that encloses initial approval portrait of former experience in the field of specialization and the volume of business assigned to the company during the previous five years and the size of capital and equipment company with a statement sending the certificates to prove it and to determine the deadline for registration on 30.05.2014 and can participate in more than one specialty contractors specialists 2 - is sent quotations and technical specifications and detailed drawings of specialization required to participate in a coordinated group e-mail no later than 30/07/2014 3 - will be display setting the final price for the design , supply and installation of power plants, and send it to the members of the group and coordination with them and coordinate with the official of the Ministry of Electricity in Egypt and the Egyptian government - to be ready to make a bid in the history of 26 Sept 2014 When there are questions or Suggestions please contact reda_wahb@yahoo Notes 1- I apply for getting official agreement of the Ministry of Electricity in Egypt 2- I shall be prepare all detail technical specification for 96 branches control building , and cable feed net for different unit ,detail of fire fighting system for branches control building, net feed drink water for branches control building , clean and remove water moisture and drain from solar panels every one contain 2 compressor and net distribution air pipe and air injection nozzle after design mechanical and electrical system for plant . 3 - I apply for registration of the dual system to generate solar power energy by using double effect and products system ( PV + CSP) or (Egyptian Parabolic Trough Concentrating Solar Panels ) EPTCSP for concentrating solar radiation System in the record of renewable energy sources and record in United States Code of renewable energy production and recording Solar Power Energy Groups in the log suppliers to the U.S. Department of Energy and the inclusion of these projects within the programs and plans of producing electric power in the United States of America for 2015 and beyond 4 -All design for Civil work shall be start after finishing design mechanical and electrical works 4- All detail design will be send after 5/ 6 / 2014 after your study the projects and reply with type subcontractor or main contractor or consultant work and determination your position in group and technical specification now enough for that Thanks Cairo at 10 /5/ 2014 Engineer ; Reda Mohamed Ahmed Ahmed Wahb [email protected] ; Mobil ; 002 0122 3178476
Posted on: Fri, 16 May 2014 14:51:23 +0000

Trending Topics



Recently Viewed Topics




© 2015