Due to the volume of signs & safety equipment now required for our - TopicsExpress



          

Due to the volume of signs & safety equipment now required for our crit racing & due to the fact we no longer have onsite storage a better delivery system was needed to reduce the double handling. As this in an interim measure, a CHEAP but effective alternative was required. See attached photo & details below. 1) Cost to Club........ NIL 2) Construction material........ Scrap 3) Design time........ 34 to 37 seconds 4) Construction time....... about the same 5) Finesse & detail ......... None 6) Ease of use......Shes a beaut So for all of you out there who have a forklift & some storage area we can put you on the sign roster again !! Lol Seriously, we do have other plans in the pipeline & this is definitely an interim measure. See you all in the morning assuming its not raining. Check our Facebook page at 7.00 AM, we will make a call then, should be OK as the forecast is for late afternoon storms.
Posted on: Sat, 06 Dec 2014 03:37:15 +0000

Trending Topics



Recently Viewed Topics




© 2015