How it Works All Room at the top staff are full time employees - TopicsExpress



          

How it Works All Room at the top staff are full time employees not subcontractors. You will be allocated one of our teams and they will stay with you on a day to day basis until the end of the conversion (we do not move staff from job to job for any reason). Should you wish to use your own plans that’s fine, we will work with your architect. When we survey your property inform us what you would like us to quote for and we can provide you with a detailed quotation based on the work you want done. Alternatively if you don’t want the hassle or worry we can carry out the full loft conversion for you from plans to completion. All you’ll have to worry about is what colour you want to paint it. Survey A member of our team carries out a no obligation survey on your property. This enables us to discuss your requirements and for us to offer our advice on the best option for you. We will ensure that the proposed conversion compliments the existing exterior of your house and provides you with the maximum amount of living space for your loft area. Quotation A fixed quotation will be sent to you detailing all proposed work and specifications. Should you wish to proceed, we will issue you a schedule of payments, which will clarify the payment dates for your conversion and will confirm the agreed work that is to be carried out. We will not ask you for a deposit. Please note that a final payment will only be required once all work is completed. Plans A member of our team will carry out a full survey of your property and initiate for the full working drawings and structural calculations to be drawn up. These will comply with all current building regulations. The cost of the plans and calculations are included in the quotation. Local Authority Permission The proposed plans will be forwarded to you for your approval before they are submitted into your local authority. Any alterations you want can be made at this point. Should you require planning permission, the appropriate forms will be completed and submitted. Planning permission normally takes 8 to 12 weeks depending on your local authority. Throughout this time, room at the top will liaise with the council concerning the progress of your application and act accordingly should it be required. Once planning permission / lawful development is obtained or before work commences, full plans and structural calculations will be submitted to the Building Control Department or Independent Building Control Inspectors. A statuary commencement notice will be sent to the council informing them when work is going to begin on your property. We work closely and consult the appointed Inspectors throughout your conversion. Site visits to inspect the work are arranged when appropriate. Ready to Start Once all approvals that are required have been obtained, we will confirm your start date. A member of your team will meet with you before any work commences on your property. We will arrange for the scaffolding to be erected and materials to be delivered ready for work to commence. The Conversion Every conversion is different depending on your property, type of loft conversion and design. However, they do tend to follow a pattern. Preparation Independent scaffolding is erected We create an opening in your roof for access to your loft area Existing chimney and tanks are removed if required Receive 1st fix materials Arrange for delivery of skip Structural Work All load bearing steels, trimmers, and steel plates that are relevant to your job are installed Structural walls of the dormers, hip to gables, and mansard are formed New structural floor joists are laid. Plumbing Work: 1st Fix Tanks that are in use are disconnected and re-located in the void area within your loft space New pipe work is laid ready to accommodate fixtures to the loft room Electrical Work: 1st Fix New wires are laid ready to accommodate all electrical fittings to your loft room(s) External Work New UPVC Double glazed windows are installed Velux skylight windows and flashing kits are installed Roofing work including tiling, lead work and flat roof/s is completed Fascia boards, guttering and down pipes are fixed New external walls are rendered or tiled. Internal Work The whole of the loft is insulated to comply with Building Regulations Internal walls are formed Flooring is laid creating loft room floor Stairs to loft area are in installed last to minimize disruption Whole area of loft conversion is clad with plasterboards Two coats of plaster are applied to boarded areas Plumbing Work: 2nd Fix Radiators, sanitary ware are installed Waste connection is connected into your existing drainage system Existing S.V.P is extended Electrical Work: 2nd Fix Plug sockets, light points, extractors fans etc. are connected to the wiring in your loft Connection is made to your existing fuse board Second Fix Skirting and architrave is fixed throughout your newly converted rooms ½-hour fire checked doors are hung. New handrails fitted to new stairs. Completed The site is cleared Scaffolding is removed All skips are removed from site Building Control Approval Inspections from your appointed Building Inspector will take place throughout your conversion. A final inspection will be carried out and a completion letter issued. Your whole loft conversion WILL be completed within 4 weeks
Posted on: Mon, 15 Sep 2014 09:43:31 +0000

Trending Topics



Recently Viewed Topics




© 2015