@Internal use* SPKNH 7/7 OMP CM completed loading 22/1200 loaded 43 trucks 1,035.200 MT Hose off ? Sailed 22/1400 (wait for report) ETA TRD 23/0100 ETB 23/1500 ETD 24/1500 SRC ETA 25/1600. B21 commenced loading 22/0435 completed 22/1120 sailed 22/1530 shifted to OPL PK for bunkering ETD 22/1900 ETA KB 24/1600 loaded 1,844.144 MT Bls loaded 1,838.997 MT ship/survey. ETA PKT (repair) 26/0300 - 10/1800 SIRE inspection 12/9-14/9. B27 ETA BKKBAR 01/1600 POB 02/0600 arrival draft 3.80 M ETB BPP jetty 02/0900 (Monday)