It was a super busy week at The Heart of AN with much progress. All the downstairs floors were completed and they are now putting pastileros in the upstairs bathrooms. Three different carpenters are creating our doors, as well as cabinets for the kitchen and bathrooms, and shelves for the pantry and art studio. A small pump house has been built. The showers are being tiled. The acequia canal around our house is being cleaned and deepened. The front gate has been installed! The palos are being sanded and lacquered.
Posted on: Wed, 30 Jul 2014 18:58:31 +0000