Janitors and Cleaners NEEDED for Dallas area, Essentially: - TopicsExpress



          

Janitors and Cleaners NEEDED for Dallas area, Essentially: Entry, conf rooms, offices, hallways, small storage, etc are 5,000 sq feet combined. Production areas is 25,000 sq feet combined. - all bathrooms (5 total) & break room (1 total): 2x per week - mop, disinfect, clean everything, trash, replenish paper towels, toilet paper, soap, etc - all production floors: 1x per week - sweep, dust mop, empty trash/liners - all production floors: 1x per month - wet mop (auto scrubber allowed) - offices: 1x per week includes mopping, light dusting, vacuuming, trash/liners, etc Below is more detailed from another vendor we are getting a bid on: Entry (1x per wk): • ● dust reception area (loose paperwork will not be disturbed) • ● wipe down counter • ● spot clean glass wall • ● clean both sides of front door • ● clean door and window frames • ● dry and wet mop polished concrete floor Front Conference Room (1x per wk) • ● clean table top • ● dust chairs • ● police for trash and align chairs • ● thoroughly vacuum carpet Small Meeting Room (1x per wk) • ● clean table top • ● dust chairs • ● police for trash and align chairs • ● thoroughly vacuum carpet Anand’s Office (1x per wk) • ● dust furniture (loose paperwork will not be disturbed) • ● dust any artwork, whiteboards and signage • ● dust window frames • ● empty trash and replace liners as needed • ● dry and wet mop polished concrete floor Bill’s Office (1x per wk) • ● dust furniture (loose paperwork will not be disturbed) • ● dust any artwork, whiteboards and signage • ● dust window frames • ● empty trash and replace liners as needed • ● dry and wet mop polished concrete floor Empty Office (1x per wk) • ● will be checked for cleanliness until occupied then as other offices • ● dust furniture (loose paperwork will not be disturbed) • ● dust any artwork, whiteboards and signage • ● dust window frames • ● empty trash and replace liners as needed • ● thoroughly vacuum carpet Storage (1x per wk) • ● dust furniture • ● thoroughly vacuum carpet Open Office/Cubicle Area (1x per wk) • ● dust furniture (desks with loose paperwork will not be disturbed) • ● dust cubicle frames and tops • ● empty trash and replace liners as needed • ● thoroughly vacuum carpet Hallway (1x per wk) • ● dust tops of filing cabinets • ● dry and wet mop polished concrete floor Main Conference Room (1x per wk) • ● clean table top • ● dust/wipe down leather chairs • ● police for trash and align chairs • ● spot clean glass to production • ● dry and wet mop polished concrete floor Restrooms (2x per wk) • ● clean mirrors • ● dust partitions, top of mirrors and frames • ● clean and disinfect countertops and sinks • ● empty trash, replace liners as needed and damp wipe with disinfectant if needed • ● toilets to be cleaned and disinfected both inside and out • ● toilet seats to be cleaned on both sides with disinfectant • ● remove splash marks from walls around basins • ● dust mop ceramic tile floors • ● wet mop ceramic tile floors using disinfectant • ● restock soap, towels and tissue as needed Production Restrooms (2x per wk) • ● clean mirrors • ● dust partitions, top of mirrors and frames • ● clean and disinfect countertops and sinks • ● empty trash, replace liners as needed and damp wipe with disinfectant if needed • ● toilets to be cleaned and disinfected both inside and out • ● toilet seats to be cleaned on both sides with disinfectant • ● remove splash marks from walls around basins • ● dust mop VCT floors • ● wet mop VCT floors using disinfectant • ● restock soap, towels and tissue as needed Break Room/Mezzanine (2-3x per wk) • ● clean tables and chairs • ● clean coffee maker and pot(s) • ● clean and disinfect counter and sink • ● clean inside and outside of microwave(s) • ● clean exterior of refrigerator • ● clean interior of refrigerator (1x per week) • ● dust cabinets • ● dust television • ● dry mop VCT floor • ● wet mop VCT floor Production Floor - 25,000 sq feet • ● dust mop weekly • ● scrub monthly • ● empty all floor level garbage cans and replace liner All Areas (Monthly) • ● high/low dusting to include window blinds, all corners, chair bases in front office areas, baseboards, etc.
Posted on: Tue, 20 Jan 2015 23:21:00 +0000

Trending Topics



Recently Viewed Topics




© 2015