Link to download an example Petroleum Engineer Price-Curve for GSA - TopicsExpress



          

Link to download an example Petroleum Engineer Price-Curve for GSA OASIS *** Dear Membership: As all of you should be aware, as of Aug. 30, 2013, GSA OASIS has been amended - Three (3) amendments and Four (4) amendments for Small Business and [Unrestricted], respectively. Due to these changes, revised Price-Curves are being sent out this weekend. INTERPRETING PRICE CURVES For each labor category: 1. Lower Statistical Limit (LSL) = absolute lowest direct market price-point 2. Upper Statistical Limit (USL) = absolute highest direct market price-point 3. Spectrum between lower right-tail and USL = Cleared personnel direct market price-points (from right tail, increase one standard deviation per clearance level) 4. Spectrum between Mean and lower right-tail = Recommended IDIQ offering price-point distribution 5. Spectrum between lower left-tail and Mean = Recommended Task-Order offering price-point distribution See this link to view an example Petroleum Engineer Price-Curve: issuu/rudysutherland/docs/49-52._oasis_price_curve_model_-_pe *** INDEPENDENT PRICING SUPPORT IS NOW AVAILABLE We have received several requests by firms that do not have enough time to become vetted members before the due-date for RFP responses, BUT nevertheless, desire to receive Price-Curves for use on their responses with intent to possibly team through the Teaming Exchange after the due date. The steps are simple; you must (1) execute the non-binding Letter of Intent (LoI), and then (2) specify the pricing package you require to begin the process. PRICING PACKAGES Right now, we have two (2) Price-Curve package options to consider: BASIC: unburdened rates, ready for indirect rate build-up. Tailored to the specific "SERVICE OCCUPATIONAL CLASSIFICATIONS" for the pools you are pursuing ONLY. CUSTOM: fully-burdened rates form information you provide; PtW and PtB adjusted to account for either your (1) historical annual indirect rates or (2) budgetary/provisional rates. For details email: admin@boston-warwick *** This offer will be available through CoB Sept. 16th. If the due-date for either the [Unrestricted] or SB is extended by GSA, we will consider the same for the Price-Curve Packages. Thank you,
Posted on: Sun, 08 Sep 2013 18:38:19 +0000

Trending Topics



Recently Viewed Topics




© 2015