New bathroom is done . . . Need to wait on using the shower - TopicsExpress



          

New bathroom is done . . . Need to wait on using the shower because of the last bit of caulking . . . and the room behind the bathroom, which is so beautiful with the pine paneling, has a painted floor so that needs to dry for about 24 hours to touch before walking on it, and then 3-4 more days before putting things in . . .I am so thrilled with all the work . . . the looks of it and everything. The original spaces (bathroom and storage room) had to be torn down all the way to the ground because of rot and bug damage and basically rebuilt. Everything is new, including the plumbing and electrical. The light over the sink is an LED strip and the overhead light is a whisper-fan plus light . . . The shower is a corner round shower . . . the floor is a good quality linoleum and the sink is adorable. So, I am happy happy happy . . .
Posted on: Wed, 30 Jul 2014 22:48:45 +0000

Trending Topics



Recently Viewed Topics




© 2015