News from the Sparky’s WERE BACK Friday started with the continuation of the installation of cable trays on the main deck passage way deck head. This is being used to tidy up the cabling that has been installed over the years. A new junction box was installed to replace the original as this one stopped a door from being completely opened. Saturday I continued on with the cable tray installation and worked on a fire alarms fault. Paul spent most of Saturday on faults and testing on the main deck lighting cabling. So far on the main deck over 100 light fittings have been checked and repaired a great job done by the electrical team, well done but the main deck has not been completed yet. On Sunday I continued on with checking the fire alarm and checked the sacrificial anodes changing 4 that were well dissolved. The ship is again fully protected. Warwick