Now for the power. The power requirements in our new kitchen are more than we had available, especially since 3 phase would be needed. Since we already had 4 separate services on our farm, we decided to put 1 large 600 amp 3 phase service in & run new pipe & wire to all the existing services in addition to a couple new ones, as long as we were in the mood. With the help of our neighbor who did the boring, we bored under buildings & under driveways to replace all the services that were on the farm. There were 5 bored locations & 2 trenched to equal about 750 ft total. Now to put this all together & get wire to these locations. We will replace them 1 at a time. Beautiful weather for an outside project.