OIL EXPLORATION AND PRODUCTION TRAINING COURSES.NOV-dec - TopicsExpress



          

OIL EXPLORATION AND PRODUCTION TRAINING COURSES.NOV-dec 2014. ECLIPSE(2weeks)DYNAMIC RESERVOIR SIMULATION (PREDICTION & HISTORY MATCHING) A .An Introduction to dynamic ISOTHERMAL BLACK OIL simulation (ECLIPSE 100) B. The DIFFUSSIVITY equation & MB. Equations (EOS), VLPs & IPRs C.Introduction to Eclipse and Eclipse family of softwares(eclipse 100,300,PVTi fluid characterization, office etc.) D, understanding and coding eclipse using notepad. (ascii method ,include files . 1. The RUNSPEC, 2. GRID section.(grid) permx, permy, permz, porosity……… 3.Properties section,(Live oil PVTO,DEADOIL PVCDO,FLASH PARAMETERIZATION) 4. Solution -initialization section(EQUILIBRATION,AQUIFERS) 5. Schedule section (Prediction simulation/HISTORY MATCHING). 6.Summary section (OUTPUT OF SIMULATION RESULTS,FIELD,WELL AND BLOCK PRODUCTION E.T.C 7, Running a case generated in petrel in eclipse (gullfaks oil field, Egypt oil field ) 8. Introduction to eclipse office 9. Building & running a prediction & HISTORY MATCH model of CASE STUDIES OF a NUMERICAL aquifer reservoir in eclipse 10. Building and running artificial gas lift operation in eclipse. 11. Running API TRACKING simulation in eclipse. 12. Brine injection (artificial lift) 13. Technical discussion and interpretation of graphs (PVT,SATURATION,PRODUCTION) 14. PVT ANALYSIS USING PVTI 15. SIMOPT IN ECLIPSE PROSPER(WELL COMPLETION DESIGN &PERFORMANCE ANALYSIS)-(2weeks) 1. Introduction to prosper. 2.getting started, modelling a natural flowing well. 3. gas lift design and operation for a single well. 4.well and flow line modeling. 5.ESP –(electric submersible pump) lifted well and pump sizing for artificial lifting 6.modeling a gravel packed gas well. 7. modeling a horizontal well friction dp 8. model of gas injector with down hole chokes in a multilateral well model .MBAL (material balance, history matching and prediction for single well)(1week) 1. Introduction to mbal 2. Model of aquifer driven oil reservoir. 3. History matching and prediction with set flow rates for single wells and control by (water cut & GOR 4.HISTORY MATCHING AND PREDICTION ,TANK BY TANK BASIS. GAP(GENERAL APPLICATION PACKAGE)(4 WEEKS) 1.INTERGRATING PROSPER AND MBAL TO CREAT A COMPLETE RESERVOIR SYSTEM. 2.OPTIMIZING RESERVOIR PERFORMANCE. Prerequisite:All fields involved in exporation and production . Date: batch dates -4th November,18th November,2nd December,10th December, 2014 Venue-Eldemuz Engineering Training centre. First floor,60 Aba road by craft centre busstop Portharcourt info @eldemuz,cemekah1@yahoo 08038812638,08064673745.
Posted on: Fri, 07 Nov 2014 22:52:39 +0000

Trending Topics



Recently Viewed Topics




© 2015