TBM Belt Conveyor : MAINTENANCE INTERVAL:ASSEMBLY GROUP/ COMPONENTS: MAINTENANCE WORKS AND CHECKS:REMARKS a)Day: General: Motors, Gears, Bearings, Positions, Roller Carriers, drive rolls, guide pulleys, Scrapers, Chain drive Check: Temperature, running noises, re-adjust scrapers, belt tension, chain/rod tension (belt conveyor structure hook to segment hook), Removal of Conveyed Material accumulation at the transfer stations. Re- Lubrication of the drum bearings, Cleaning if required. safety guard and covers. Ripcord:Function check b)Week: Roller carrier drums :Removal of caking Conveyor belt Check: Fissures, Grooves Drive motor Check: Oil levels, Cleaning c)Month: Screw connections Check: Tight fit Random check
Posted on: Wed, 10 Jul 2013 02:19:34 +0000