Write up on Roof Top SPV Systems Several cities and towns in the - TopicsExpress



          

Write up on Roof Top SPV Systems Several cities and towns in the country ar e experiencing a substantial growth in their peak electricity demand. Municipal Corporations and th e electricity utilities are finding it difficult to cope with this rapid rise in demand and as a result most of the cities/towns are facing severe electricity shortages. Various industries and commercial establishments e.g. Malls, Hotels, Hospital s, Nursing homes etc housing complexes developed by the builders and developers in ci ties and towns use diesel generators for back-up power even during the day time. Thes e generators capacities vary from a few kilowatts to a couple of MWs. Generally, in a single establis hment more than one generators are installed; one to cater t he minimum load required for lighting and computer/ other emergency oper ations during load shedding and the others for running ACs and other operations such as lifts/ othe r power applications. With an objective to reduce dependency on diesel gensets, a schem e to replace them with SPV is being proposed. Further, in order to utilize the existing roof s pace of buildings, the scheme proposes to promote roof-top SPV systems on buildings to r eplace DG gensets installed for minimum load requirement for operation during load shedding. These loads are generally varying between 25 kW to 100 kW or so. A roof top SPV system c ould be with or without grid interaction. In grid interaction system, the DC power generated fr om SPV panels is converted to AC power using power conditioning unit and is fed to the grid either of 11 KV three phase line or of 220 V single phase line depending on the system installed at institution/commercial establishment or residential complex. They generate power during the daytime which is utilized fully by powering the captive loads a nd feeding excess power to the grid as long as grid is available. In case s, where solar power is not suffi cient due to cloud cover etc. the captive loads are served by drawing power from the grid. The grid- interactive roof- top SPV systems thus work on net metering basis wherein the beneficiary pays to the utility on net meter reading basis only. Id eally, grid interactiv e systems do not require battery back up as the grid acts as the ba ck-up for feeding excess solar power and vice- versa. However, to enhance the performance reliability of the overall systems, a minimum battery-back of one hr of load c apacity is strongly re commended. In grid interactive systems, it has , however to be ensur ed that in case the grid fails, the solar power has to be fully utilized or stopped immediately feeding to the grid (if any in excess) so as to safe-guard any grid person/technician from getting shock (electrocuted) while working on the grid for maintenance etc. This feature is termed as ‘Islanding Protection’ Non-grid interactive systems ideally requir e a full load capacity battery power back up system. However, with the intro duction of advanced load management and power conditioning systems, and safety me chanisms, it is possible to segregate the day-time loads to be served di rectly by solar power without necessarily going through the battery back-up. As in the previous ca se of grid-interactive systems, minimum one hour of battery back-up is, however, stro ngly recommended for these systems also to enhance the performance reliability of the syst ems. The non-grid in teractive system with minimum battery back are viable only at plac es where normal power is not available during daytime. In case the SPV power is to be used after sunshine hours, it would require full load capacity battery back up wh ich will increase the cost of system which may not be economically viable ev en with support from Government.
Posted on: Wed, 28 Aug 2013 13:05:16 +0000

Trending Topics



Recently Viewed Topics




© 2015