uh,,I am still/yet waiting to be paid Mr barrack key - TopicsExpress



          

uh,,I am still/yet waiting to be paid Mr barrack key butt... Early on 1 August 2010, a failure in cooling Loop A (starboard side), one of two external cooling loops, left the station with only half of its normal cooling capacity and zero redundancy in some systems.[199][200][201] The problem appeared to be in the ammonia pump module that circulates the ammonia cooling fluid. Several subsystems, including two of the four CMGs, were shut down.
Posted on: Sat, 29 Nov 2014 02:49:43 +0000

Trending Topics



Recently Viewed Topics




© 2015