Work is continuing on our new home in Hadnall, below are some pictures of where the main brew house will be situated. Currently drains are being cut into the concrete floor which is in places up to 200mm thick. Once the drains are in place an epoxy floor coating will be added. The concrete flooring will hold vessels that will weigh up to 20 tonnes when full. Weve also currently having a cold store fitted out to store our casks in.
Posted on: Thu, 29 May 2014 09:28:56 +0000